Skip to content
Archon Building Group
Open warehouse floor and roller door in the Burleigh Heads industrial unit

Archon Building Group

Warehouse and industrial unit refurbishments in Burleigh Heads

Archon Building Group refurbishes warehouses and industrial units in Burleigh Heads. From improving floors and amenities to changing layouts and upgrading building services, we help you adapt an existing building to the way your business works.

Discuss your project

Or drag files here. PDF, DOCX, XLSX, JPG, PNG or WEBP. Up to 5 files, 20 MB each, 50 MB total.

Files are stored privately and only used to respond to your enquiry. See our privacy policy.

Why Archon

Why choose Archon Building Group

01

Direct communication

Our leadership team stays involved. You speak directly with the people coordinating your project about decisions, costs and the work ahead.

02

Early construction input

We review site access, existing conditions, materials and the order of work with your designers before the plans are finalised.

03

Coordinated delivery

We coordinate the trades and drawings, keep track of decisions and flag issues that could delay the work.

04

Workmanship and handover

We check workmanship during construction, including work that will be covered up, and address defects and completion records at handover.

Your project in Burleigh Heads

Burleigh Heads has distinct coastal and inland creek settings. Council describes the Tallebudgera Creek mouth beside the national park and beach, and a separate conservation-park access area at West Burleigh Road and Loman Lane connecting with Burleigh Ridge Park trails.

For work premises around the inland West Burleigh Road area, show the actual road frontage, delivery vehicle sizes and on-site loading arrangement. If access is shared, agree where stock and materials can wait while refurbishment proceeds.

Mark the stock, machinery and loading areas that remain in use, and identify where they can move while floors, doors or services are upgraded.

Sources for the locality context

Local project reference

Industrial unit refurbishment in Burleigh Heads

Archon refurbished an industrial unit in Burleigh Heads, including the entry lobby, an open warehouse floor with a roller door, floor drainage and bathrooms.

For a similar project, separate the proposed warehouse work from the lobby and amenities on your drawings. If wet work or washing is part of your intended use, give your consultants the cleaning method and drainage requirements before choosing floor finishes. Existing drains alone do not establish suitability for a new use.

Wash bay at the refurbished Burleigh Heads industrial unit

Retaining the building while changing the operation

If stock or machinery stays in the warehouse, mark what must move and who will move it. Where floors, drains or a mezzanine are affected, provide condition reports and have the relevant consultants check suitability for the proposed use. Shared driveways and loading areas may need an agreed staging arrangement.

Planning the work

Warehouse and industrial unit refurbishments: the project brief

Investigate before pricing

Gather existing drawings and inspect visible conditions. Floor condition, drainage, retained structure and service connections influence what can be retained and what needs further investigation.

Workflow and staged access

Plan equipment moves, stock storage and vehicle access alongside the work zones. If the business remains open, agree how each completed stage reconnects to the operation.

Integrated upgrades

Coordinate floor finishes, doors, amenities, drainage and service changes as one building scope. Equipment suppliers and consultants should confirm connection details before construction proceeds.

What to send with your enquiry

Existing plans, condition reports, equipment layout and a list of retained and replacement items. If you do not have everything yet, tell us what is available so we can discuss your plans and what needs to happen before work starts.

Questions before you begin

Does an existing floor drain mean my unit is suitable for washdown?

No. Your consultants need to assess the proposed use, drainage and finishes at your property. Send plans and the intended cleaning process so these requirements can be checked before the work is priced.

How do we prioritise warehouse upgrades?

Identify the operational problem first: layout, floor condition, access, amenities or service capacity. List retained and replacement work, then review how the changes fit together.

How are stock and equipment moves planned?

Agree who relocates each item and where it goes during construction. Mark temporary storage and loading routes so each work stage has a practical operating plan.

Get in touch

Discuss your Burleigh Heads project.

Whether you're still working through feasibility or have documentation ready to price, we're happy to talk it through. Early conversations usually save time later.