Skip to content
Archon Building Group
61 Harper Street warehouse refurbishment in Molendinar

Archon Building Group

Warehouse and industrial unit refurbishments in Geebung

Archon Building Group refurbishes warehouses and industrial units in Geebung. From improving floors and amenities to changing layouts and upgrading building services, we help you adapt an existing building to the way your business works.

Discuss your project

Or drag files here. PDF, DOCX, XLSX, JPG, PNG or WEBP. Up to 5 files, 20 MB each, 50 MB total.

Files are stored privately and only used to respond to your enquiry. See our privacy policy.

Why Archon

Why choose Archon Building Group

01

Direct communication

Our leadership team stays involved. You speak directly with the people coordinating your project about decisions, costs and the work ahead.

02

Early construction input

We review site access, existing conditions, materials and the order of work with your designers before the plans are finalised.

03

Coordinated delivery

We coordinate the trades and drawings, keep track of decisions and flag issues that could delay the work.

04

Workmanship and handover

We check workmanship during construction, including work that will be covered up, and address defects and completion records at handover.

Your project in Geebung

Geebung’s railway is crossed by the overpass connecting Robinson Road East and Robinson Road West; the official project account distinguishes that route from the former Newman Road level crossing. This makes the side of the railway and final street connection important briefing details.

For a workshop or warehouse proposal, verify the actual route from Robinson Road to the loading gate, including vehicle clearance and turning requirements.

Mark the stock, machinery and loading areas that remain in use, and identify where they can move while floors, doors or services are upgraded.

Sources for the locality context

Retaining the building while changing the operation

If stock or machinery stays in the warehouse, mark what must move and who will move it. Where floors, drains or a mezzanine are affected, provide condition reports and have the relevant consultants check suitability for the proposed use. Shared driveways and loading areas may need an agreed staging arrangement.

Planning the work

Warehouse and industrial unit refurbishments: the project brief

Investigate before pricing

Gather existing drawings and inspect visible conditions. Floor condition, drainage, retained structure and service connections influence what can be retained and what needs further investigation.

Workflow and staged access

Plan equipment moves, stock storage and vehicle access alongside the work zones. If the business remains open, agree how each completed stage reconnects to the operation.

Integrated upgrades

Coordinate floor finishes, doors, amenities, drainage and service changes as one building scope. Equipment suppliers and consultants should confirm connection details before construction proceeds.

What to send with your enquiry

Existing plans, condition reports, equipment layout and a list of retained and replacement items. If you do not have everything yet, tell us what is available so we can discuss your plans and what needs to happen before work starts.

Questions before you begin

How do we prioritise warehouse upgrades?

Identify the operational problem first: layout, floor condition, access, amenities or service capacity. List retained and replacement work, then review how the changes fit together.

How are stock and equipment moves planned?

Agree who relocates each item and where it goes during construction. Mark temporary storage and loading routes so each work stage has a practical operating plan.