
Archon Building Group
Warehouse and industrial unit refurbishments in Northgate
Archon Building Group refurbishes warehouses and industrial units in Northgate. From improving floors and amenities to changing layouts and upgrading building services, we help you adapt an existing building to the way your business works.
Discuss your project
Why Archon
Why choose Archon Building Group
01
Direct communication
Our leadership team stays involved. You speak directly with the people coordinating your project about decisions, costs and the work ahead.
02
Early construction input
We review site access, existing conditions, materials and the order of work with your designers before the plans are finalised.
03
Coordinated delivery
We coordinate the trades and drawings, keep track of decisions and flag issues that could delay the work.
04
Workmanship and handover
We check workmanship during construction, including work that will be covered up, and address defects and completion records at handover.
Your project in Northgate
Northgate’s rail setting sits alongside the broader Melton Road connection shared with Nundah. Council’s corridor study specifically covers Toombul Road to Walkers Way, giving a defined street context rather than a suburb-wide access assumption.
For a workshop or storage brief, establish which street provides lawful vehicle access and how loading can be contained at the actual premises.
Mark the stock, machinery and loading areas that remain in use, and identify where they can move while floors, doors or services are upgraded.
Sources for the locality context
Retaining the building while changing the operation
If stock or machinery stays in the warehouse, mark what must move and who will move it. Where floors, drains or a mezzanine are affected, provide condition reports and have the relevant consultants check suitability for the proposed use. Shared driveways and loading areas may need an agreed staging arrangement.
Planning the work
Warehouse and industrial unit refurbishments: the project brief
Investigate before pricing
Gather existing drawings and inspect visible conditions. Floor condition, drainage, retained structure and service connections influence what can be retained and what needs further investigation.
Workflow and staged access
Plan equipment moves, stock storage and vehicle access alongside the work zones. If the business remains open, agree how each completed stage reconnects to the operation.
Integrated upgrades
Coordinate floor finishes, doors, amenities, drainage and service changes as one building scope. Equipment suppliers and consultants should confirm connection details before construction proceeds.
What to send with your enquiry
Existing plans, condition reports, equipment layout and a list of retained and replacement items. If you do not have everything yet, tell us what is available so we can discuss your plans and what needs to happen before work starts.
Questions before you begin
How do we prioritise warehouse upgrades?
Identify the operational problem first: layout, floor condition, access, amenities or service capacity. List retained and replacement work, then review how the changes fit together.
How are stock and equipment moves planned?
Agree who relocates each item and where it goes during construction. Mark temporary storage and loading routes so each work stage has a practical operating plan.

Get in touch
Discuss your Northgate project.
Whether you're still working through feasibility or have documentation ready to price, we're happy to talk it through. Early conversations usually save time later.

